1.) Checks layout references given by Line & Grade / Surveyor and prepares reference points for finishing of concrete poured;
2.) Performs concrete hollow blocks laying/Plastering works;
3.) Applies the required finish of the slab (rough/trowel finish) after concrete pouring;
4.) Pours out the cement mixture based on the required elevation of the structures;
5.) Maintains the cleanliness of the area after work; and
6.) Performs other tasks that may be assigned from time to time.